Re-Structuring of IT Cadre in Zonal Railways/Production Units
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
RAILWAY BOARD
RBA No. 22/2019
No. 2016/AC-II(CC)/37/9
28-3-2019
General Managers,
All Zonal Railways and Production Units (including RDSO)
Sub :– Re-Structuring of IT Cadre in Zonal Railways/Production Units.
Ref:- Board’s letter of even No. dated 18.04.2017 (RBA 45/2017).
Further to the instructions issued vide Board’s letter ibid, the matter regarding restructuring of Senior Engineer (IT) and Junior Engineer (IT)’s post of IT Cadre in Zonal Railways/Production Units has again been reviewed in the Ministry of Railways and it has now been decided with the approval of competent authority, that the cadre restructuring of the post of Senior Engineer (IT) and Junior Engineer (IT) of IT Cadre, earlier approved on the basis of operated strength as on 1.4.2017 in the ratio of 67:33 respectively, shall now be done on the basis of Sanctioned Strength of Senior Engineer (IT) and Junior Engineer (IT) w.e.f. 1.4.2017. The entire up-gradation has to be revenue neutral. Accordingly, the revised sanctioned strength of Senior Engineer (IT) and Junior Engineer (IT) of IT Cadre in Zonal Railways/Production Units as on 1.4.2017 after restructuring duly taking into account the surrender of JE/IT posts shall be as under:-
S.NO | ZONAL RAILWAY/PRODUCTION UNIT | REVISED SANCTIONED STRENGTH AFTER RESTRUCTURING W.E.F 1.4.2017 | ||
---|---|---|---|---|
HAT | SE/IT | Total | ||
1 | Central Railway | 23 | 50 | 73 |
2 | Eastern Railway | 49 | 51 | 100 |
3 | Northern Railway | 44 | 50 | 94 |
4 | North Eastern Railway | 20 | 37 | 57 |
5 | North East Frontier Railway | 8 | 90 | 98 |
6 | Southern Railway | 20 | 37 | 57 |
7 | South Central Railway | 13 | 51 | 64 |
8 | South Eastern Railway | 27 | 65 | 92 |
9 | Western Railway | 10 | 33 | 43 |
10 | North Western Railway | 10 | 18 | 28 |
11 | West Central Railway | 0 | 22 | 22 |
12 | East Coast Railway | 3 | 10 | 14 |
13 | East Central Railway | 1 | 16 | 17 |
14 | South Western Railway | 8 | 4 | 12 |
15 | North Central Railway | 16 | 31 | 47 |
16 | South East Central Railway | 5 | 37 | 42 |
17 | Diesel Modernisation Works, Patiala | 1 | 8 | 9 |
18 | Rail Wheel Factory, Bengaluru | 0 | 14 | 14 |
19 | Chittaranjan Locomotive Works | 12 | 31 | 43 |
20 | Diesel Locomotive, Varanasi | 1 | 31 | 32 |
21 | Integral Coach Factory | 7 | 40 | 47 |
22 | Central Organisation for Railway Electrification | 0 | 1 | 1 |
23 | Metro Railway, Kolkata | 0 | 8 | 8 |
24 | RDSO, LKO | 0 | 9 | 9 |
25 | Rail Coach Factory (KXH) | 0 | 45 | 45 |
Total | 278 | 789 | 1067 |
3. Surrender of Post in JE/IT will be effected before implementing above mentioned cadre restructure orders and the resultant imbalance/variation in the cadre due to surrender of posts of JE/IT shall be reviewed at the time of next annual review of the cadre after implementation of cadre restructuring.
4. Zonal Railways/Production Units may update the book of sanction as per the above sanctioned post w.e.f 1.4.2017..
5. All the other terms and condition mentioned in Board’s letter ibid remain unchanged.
(Gaisingam Kabui)
Director Finance/CCA,
Railway Board