Classification of Trains as high Speed Trains for the purpose of Trip Allowance
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
RBE No.91/2019
No.E(P&A)II-2010/RS-17
New Delhi, dated: 04.06.2019.
The General Managers(P)/CAOs,
All Indian Railways & Prod. Units etc.
Sub: Classification of Trains as high Speed Trains for the purpose of Trip Allowance (PNM/NFIR item No.7/2012).
Ref : Railway Board’s letters No. E(P&A)II/87/FE-2/1 dated 24.06.1991, 28.07.1992, and 02.11.1993.
A PNM/NFIR meeting was held on 16.10.2017 and in the item No. 7/2012 it was decided that Duronto Trains, which can be classified as ‘High Speed Trains’, may be included for payment of Trip Allowance to the Running Staff. GS/AIRF was also consulted in the matter. Consequently, a fresh review was undertaken by the Board with reference to classifying Duronto Trains as ‘High Speed Trains’ for the purpose of Trip Allowance. Accordingly, in partial modification to Railway Board’s letter No. E(P&A)II/87/FE-2/1 dated 24.06.1991 the following trains have also been determined as ‘High Speed Trains’ for regulating Trip Allowance to their crew, at specified rates. Co-drivers may also be provided on these trains keeping with the extant instructions.
S.NO | TRAIN NO | NAME OF TRAIN |
---|---|---|
1 | 12213/12214 | YPR-DEE Duronto |
2 | 12221/12222 | PUNE-HWH Duronto |
3 | 12223/12224 | LTT-ERS Duronto |
4 | 12227/12228 | BCT-IND Duronto |
5 | 12239/12240 | BCT-JP Duronto |
6 | 12245/12246 | HWH-YPR Duronto |
7 | 12259/12260 | SDAH-NDLS Duronto |
8 | 12261/12262 | CSTM-HWH Duronto |
9 | 12263/12264 | Pune-NZM Duronto |
10 | 12267/12268 | BCT-ADI Duronto |
11 | 12269/12270 | MAS-NZM Duronto |
12 | 12273/12274 | HWH-NDLS Duronto |
13 | 12275/12276 | ALD-NDLS Duronto |
14 | 12281/12282 | BBS-NDLS Duronto |
15 | 12283/12284 | ERS-NZM Duronto |
16 | 12285/12286 | SC-NZM Duronto |
17 | 12289/12290 | CSTM-NGP Duronto |
18 | 12293/12294 | LTT-ALD Duronto |
19 | 12297/12298 | PUNE-ADI Duronto |
20 | 22201/22202 | SDAH/PURI Duronto |
21 | 22203/22204 | VSKP-SC Duronto |
22 | 22209/22210 | BCT-NDLS Duronto |
This has the sanction of the President and issues with the concurrence of the Finance Directorate of the Ministry of Railways.
3. These orders will have effect from the date of issue.
(N.P.Singh)
Joint Director/E(P&A)
Railway Board