Status of Cadre Review proposals processed in Cadre Review Division of DoPT from 1st January 2016 to 31st March, 2021 (upto 06.04.2021)
A. Approved by Cabinet
S. NO. | NAME OF THE SERVICE | CRC* MEETING | CABINET APPROVAL |
---|---|---|---|
1 | Indian Postal Service | 28.12.2015 | 25.05.2016 |
2 | Central Reserve Police Force | 15.12.2015 | 29.06.2016 |
3 | Indian Information Service | 05.05.2016 | 24.08.2016 |
4 | Border Security Force | 29.06.2016 | 12.09.2016 |
5 | Indian P & T Accounts and Finance Service | 17.09.2015 | 27.10.2016 |
6 | Ministry of Micro, Small and Medium Enterprises (MSME) Indian Enterprise Development Service (IEDS) | 28.12.2015 | 21.12.2016 |
7 | Indian Telecom Service | 06.10.2016 | 21.12.2016 |
8 | Central Engineering Service (Roads) | 25.04.2016 | 06.03.2017 |
9 | Indian Naval Material Management Service | 24.10.2013 | 22.06.2017 |
10 | Indian Defence Accounts Service | 09.09.2016 | 19.07.2017 |
11 | Sashastra Seema Bal (SSB) (Group ‘A’ Combatised) |
19.7.2017 | 20.12.2017 |
12 | Central Industrial Security Force (CISF) | 15.05.2017 | 10.01.2018 |
13 | Indian Petroleum and Explosive Safety Service (IPESS) | 09.01.2017 | 02.05.2018 |
14 | Indian Railways Personnel Service | 19.04.2018 | 19.02.2019 |
15 | Indian Railways Traffic Service | 19.04.2018 | 19.02.2019 |
16 | Indian Railways Stores Service | 19.04.2018 | 19.02.2019 |
17 | Indian Railways Accounts Service | 19.04.2018 | 19.02.2019 |
18 | Indian Railways Service of Mechanical Engineers | 19.04.2018 | 19.02.2019 |
19 | Indian Railways Service of Electrical Engineers | 19.04.2018 | 19.02.2019 |
20 | Indian Railways Service of Engineers | 19.04.2018 | 19.02.2019 |
21 | Indian Railways Service of Signal Engineers | 19.04.2018 | 19.02.2019 |
22 | Indo Tibetan Border Police | 08.02.2019 | 23.10.2019 |
23 | Indian P&T Building Works | 02.08.2019 | 06.11.2019 |
*CRC – Cadre Review Committee
Under Secretary (CRD)
06/04/2021
B. Status of Proposals under consideration
S.NO. | NAME OF THE SERVICE | STATUS |
---|---|---|
(1) Meeting of Cadre Review Committee held (9) | ||
1. | Indian Defence Estates Service | Cadre Controlling Authority (CCA) to take approval of the Cabinet. |
2. | Indian Naval Armament Service | CCA* to take approval of the Cabinet. |
3. | Indian Cost Accounts Service | CCA* to take approval of the Cabinet. |
4. | Military Engineering Service IDSE, Surveyor, Architect) | CCA* to take approval of the Cabinet. |
5. | Central Geological Service Group ‘A’ | CCA* to take approval of the Cabinet. |
6. | Geological Survey of India Chemical Service Group ‘A’ | CCA* to take approval of the Cabinet. |
7. | Geological Survey of India Geophysical Service Group ‘A’ | CCA* to take approval of the Cabinet. |
8. | Geological Survey of India Engineering Service Group ‘A’ | CCA* to take approval of the Cabinet. |
9. | Indian Corporate Law Service | Recommendations of CRC approved by MoS (PP). File sent to DoE for obtaining approval of Finance Minister. |
(2) Considered by CRC and action required to be taken as per CRC directions (2) | ||
10. | Survey of India Group ‘A’ | As per direction of CRC, Survey of India to provide necessary details. |
11. | Indian Radio Regulatory Service | As per direction of CRC, DoT to provide details/revised information to DoPT. |
(3) Pending for consideration of CRC (2) | ||
12. | Railway Protection Force | Proposal to be considered by the CRC. |
13. | Indian Railway Health Service | Proposal to be considered by the CRC. |
(3) Pending with Department of Expenditure (1) | ||
 14. | Medical Cadres of CAPFs, NSG & AR | Recommendation of DoPT sent to DoE for approval of Secretary (Expenditure). |
(4) Pending with DoPT (0) | ||
(5) Information/clarification/reply pending with CCA (4) | ||
15. | Central Health Service (CHS) | Recommendations of DoE received, Reply from CCA is awaited. |
16. | Indian Ordinance Factories Health Service (ICFHS) | Recommendations of DoE received, Reply from CCA is awaited. |
17. | Indian Skill Development Service | MSDE to provide requisite information/clarification. |
18. | Central Engineering Service | CCA to provide necessary information |
C. Central Group ‘A’ Service where CCA had to submit cadre review proposal before April, 2021 as per Calendar for cadre review issued on 09.02.2021 (OM No. I.11019/09/2021-CRD) and status of the proposal.
S.NO. | NAME OF SERVICE | STATUS |
---|---|---|
1 | Central Engineering Service (CPWD) | Proposal not received in DoPT |
2. | Central Electrical and Mechanical Engineering Service (CPWD) | Proposal not received in DoPT |
3. | Central Architect Service (CPWD) | Proposal not received in DoPT |
4. | Central Labour Service | Proposal not received in DoPT |
Under Secretary (CRD)
06/04/2021
Note:Â (1) CCAs for Services at SI. No. 1 and 8 (of part B) to provide present status.
(2) CCAs for Services at Sl. No. 10 to 11 (of part B) to provide status report on directions of CRC.
(2) CCAs for Services at Sl. No. 15 and 16 (of part B) to provide the reply at the earliest.
(3) CCAs for Service at Sl. No. 17 (of part B) may expedite the proposal/revised information at the earliest.
(4) CCAs for Services at Sl. No. 1 to 4 (of part C) may expedite the proposal and submit it within the prescribed time limit.
(5) CCAs for the Services listed in Calendar for cadre review issued on 12.02.2021 are requested to initiate action so that the proposal/details be submitted as per the said calendar.
(5) All CCAs of Central Group ‘A’ Services (wherever due) to provide Statistical Profile (as on 1/1/2021) and Service Profile to DoPT.
(6) Information/status report/queries (if any) on any of the above could be sent on email: [email protected], [email protected].
Randhir Kumar
Under Secretary (CRD)